PERFORMANCE VERIFICATION
CHAPTER 1 GENERAL
1.1 Purpose
1.2 Scope
1.3 Definitions
CHAPTER 2 VERIFICATION OF STRUCTURAL PERFORMANCE OF CONCRETE DAM
2.1 General
2.2 Loads
2.3 Safety Verification
CHAPTER 3 PERFORMANCE REQUIREMENTS FOR DAM CONCRETE
3.1 General
3.2 Design Values for Required Performance of Dam Concrete
CHAPTER 4 TEMPERATURE CONTROL
4.1 General
CHAPTER 5 MIXTURE DESIGN OF DAM CONCRETE
5.1 Determination of Dam Concrete Performance Requirements and Performance Test Methods
5.2 Mixture Design with Variance in Dam Concrete Performance
5.3 Determination of Expected Values in Mixture Design of Dam Concrete
5.4 Determination of Mixture Proportions of Dam Concrete
CHAPTER 6 CONSTRUCTION
6.1 General
6.2 Determination of Indices for Judgment at Construction Stage
6.3 Set up of Criteria Values at Construction Stage
CHAPTER 7 QUALITY CONTROL OF DAM CONCRETE AT CONSTRUCTION STAGE
7.1 General
7.2 Quality Control and Treatments Taken at Construction Stage
7.3 Quality Identification of Dam Concrete and Measures
CHAPTER 8 INSPECTION
8.1 General
CHAPTER 9 MAINTENANCE
9.1 General

STANDARD METHODS
CHAPTER 1 GENERAL
1.1 Scope
1.2 Definitions
CHAPTER 2 STRUCTURAL DESIGN OF CONCRETE DAM
2.1 Basic Structural Requirements
2.2 Loads
2.3 Mechanical Characteristics for Structural Design
CHAPTER 3 QUALITY OF DAM CONCRETE
3.1 General
3.2 Classification of Mixture Proportion
3.3 Quality of Fresh Concrete
3.4 Quality of Hardened Concrete
CHAPTER 4 TEMPERATURE CONTROL PLAN
4.1 General
4.2 Thermal Crack Prediction
4.3 Joints
4.4 Concrete Placement Schedule
4.5 Pre-cooling
CHAPTER 5 MATERIALS
5.1 General
5.2 Cementitious materials
5.3 Mixing Water
5.4 Fine Aggregates
5.5 Coarse Aggregates
5.6 Chemical Admixtures
CHAPTER 6 MIXTURE DESIGN
6.1 General
6.2 Maximum Size of Coarse Aggregate
6.3 Particle Size Distribution of Coarse Aggregate
6.4 Sand Percentage
6.5 Water/Cementitious Material Ratio
6.6 Cementitious Material Content
6.7 Chemical Admixture Content
6.8 Indication of Mixture Proportions
CHAPTER 7 MANUFACTURE OF CONCRETE
7.1 Storage of Materials
7.2 Batching and Mixing
CHAPTER 8 CONSTRUCTION
8.1 Construction Planning
8.2 Formwork
8.3 Transportation
8.4 Preparation of Placement
8.5 Placement
8.6 Compaction
8.7 Surface Finishing
8.8 Curing
8.9 Joint
8.10 Hot Weather Concreting
8.11 Cold Weather Concreting
CHAPTER 9 QUALITY CONTROL
9.1 General
9.2 Quality Control of Materials
9.3 Quality Control of Dam Concrete
CHAPTER 10 INSPECTION
10.1 General
10.2 Inspection Method
10.3 Judgment
10.4 Treatments
CHAPTER 11 MAINTENANCE
11.1 General
11.2 Check of Dam Concrete
11.3 Remedial Measures
11.4 Recording