n    Recommendation for Shotcreting for Tunnels by NATM Method –Draft

 

 

CONTENTS

Foreword

 

Part I Recommendations for Shotcreting for Tunnels by NATM Method

Chapter 1 General

Chapter 2 Performance establishment

Chapter 3 Performance verification

Chapter 4 Construction Planning

Chapter 5 Materials and mix proportions

Chapter 6 Production and construction equipment

Chapter 7 Execution

Chapter 8 Inspection

Chapter 9 Execution Records

 

Part II JSCE Standards

 

 

 

Construction site of shotcreting for the mountain tunnel by NATM Method.

(Offered by Japan Highway Public Corporation)

 

 

 

n    Recommendation for Shotcreting “Slope Stabilization” –Draft

 

 

CONTENTS

Foreword

 

Part I Recommendations for Shotcreting "Slope Stabilization"

Chapter 1 General

Chapter 2 Required performance

Chapter 3 Performance verification

Chapter 4 Construction plan

Chapter 5 Materials and proportioning

Chapter 6 Concrete production and equipment

Chapter 7 Construction

Chapter 8 Inspection

Chapter 9 Construction records and maintenance

 

Part II JSCE Standards

 

 

 

Slop stabilization of concrete structure made by shotcreting.

(Offered by Miyagi prefecture)

 

 

 

n    Recommendations for Sprayed Mortar for Repair and Strengthening of Existing Structure

 

 

CONTENTS

Foreword

 

Part I Recommendations for Sprayed Mortar for Repair and Strengthening of Existing Structuren

Chapter 1 General

Chapter 2 Performance establishment

Chapter 3 Performance verification

Chapter 4 Design and Construction Planning

Chapter 5 Materials and mix proportions

Chapter 6 Execution

Chapter 7 Inspection

Chapter 8 Maintenance

Chapter 9 Records

 

Part II JSCE Standards

 

 

 

Construction site for repair / strengthening of RC slab with sprayed mortar.

(Offered by Prof. Uomoto’s Research laboratory at the Manufacturing Technology Research Centre)